5th Train Arrives for Bengaluru Yellow Line Metro, Set to Run Mid-October 2025

Update: 2025-10-01 17:15 IST
Representational Image.

The 5th train for the Yellow Line Metro in Bengaluru has arrived. It is scheduled to launch on September 30, 2025, and will begin running in mid-October after testing.

Why It Matters

  • The Yellow Line runs from R.V. Road to Bommasandra.
  • It connects places like Electronics City.
  • At first, there were only 3 trains, so people waited 25 minutes.
  • A 4th train came in September and reduced the waiting time to 19 minutes.
  • The 5th train will reduce the wait to about 15 minutes.

What’s Special About the Trains

  • These trains use new technology for driverless running.
  • But for now, drivers are still operating them.

Why Trains Are Late

  • Trains were delayed due to problems with the company that was making them.
  • Now, another company is sending the trains slowly.

What’s Next

  • The new train will run from mid-October.
  • It will help reduce crowding.
  • More trains are still needed.
Tags:    

Similar News