- Boost wages to drive consumer demand, sustain growth momentum: Economic Affairs Secretary
- PM Modi Urges Ministers To Promote Savings, Says ‘Khao, Peeyo, Mauj Karo’ Not Part Of Indian Culture
- Rahul calls Indian democracy 'sick' in US; BJP says he is against India's democratic fabric
- Google Gemini 4 Neon: New AI Model Promises Three Times Faster Performance
- India’s life insurer new business premium rises 26.2 pc in October
- Political row erupts over proposal to rename Mumbai’s Dadar Station as 'Chaityabhoomi'; MNS corporator protests
- World Bank warns of fresh food-price shocks
- India remains world’s fastest-growing major economy: PM Modi
TUDA plans development across four constituencies : Chairman Divakar
In Short
- Dr C Divakar Reddy announces major road, drainage, and infra projects across Chandragiri, Tirupati, Srikalahasti, and Nagari constituencies
- Eight master-plan roads covering 19 km are being constructed at a cost of Rs 200 crore, alongside a 6.8-km greenfield road connecting key highways

Dr C Divakar Reddy and Chandragiri MLA Pulivarthy Nani addressing a press conference at the Press Club in Tirupati regarding major road, drainage, and infrastructure projects
Tirupati: Tirupati Urban Development Authority (TUDA) is undertaking road and infrastructure projects across Chandragiri, Tirupati, Srikalahasti, and Nagari constituencies, announced TUDA Chairman Dr C Divakar Reddy.
Addressing a press conference alongside Chandragiri MLA Pulivarthy Nani on Friday, Dr Reddy outlined comprehensive plans to improve district infrastructure and cater to residents and pilgrims. TUDA has initiated work on eight master-plan roads spanning 19 km at an estimated cost of Rs 200 crore.
In Settipalli, 80-foot and 100-foot roads are being developed, with the layout expected to open within three months. At Tiruchanur, Rs 90 crore in TTD funds is being utilized for 2.5 km of road works, dedicated parking, annadanam spaces, and a pilgrim vehicle corridor.
Additionally, a 6.8-km, 100-foot greenfield road is under construction to connect the Madanapalle–Tirupati and Tirupati–Bengaluru highways. Further, Rs 30 crore has been tendered for a water-supply pipeline linking Peruru tank to Avilala tank via Thummalagunta. Construction of TUDA Towers has been accelerated, with commercial and residential units set to open in two to three months.
MLA Pulivarthy Nani commended TUDA for prioritizing drainage, concrete roads, and link roads in Chandragiri, noting that the Ithepalli–Rangampeta road project has received Phase One allocation of Rs 49 crore. He added that coalition leaders remain committed to Backward Class welfare, referencing the recent Supreme Court dismissal regarding local body reservations.

