- MP Cabinet approves over Rs 8,225 crore for development schemes
- Union Minister highlights highway expansion, railway connectivity in Northeast
- sewing machines will be distributed to 1.9 lakh women in 9 Dec: Ponnam Prabhakar
- SC defers hearing on Rahul Gandhi, other Oppn leaders’ plea against SIR
- Venkatesh’s Adarsha Kutumbam Gets Ticket Price Hike in Andhra Pradesh
- Rajinikanth’s Jailer 2 Latest Collection Report
- UP Election Body Apologises Over ‘Ram Didn’t Kill Any Minority’ Remark After Voter Slip Error
- Apple releases iOS 27.2 with fixes for over 160 security flaws
Bengaluru Infrastructure Development to Receive Priority: CM D.K. Shivakumar
In Short
Bengaluru Gets Major Infrastructure Boost, with 40 km Tunnel Corridor

Chief Minister D.K. Shivakumar
Bengaluru: Chief Minister D.K. Shivakumar said the state government is committed to upgrading Bengaluru's infrastructure and will give high priority to the city's development. He made this statement during a meeting with Members of the Legislative Assembly and Members of the Legislative Council from Bengaluru city, held at his official residence, Krishna, on Tuesday.
The Chief Minister said several major road projects are already under way to ease traffic in the city. These include a 40-kilometre two-lane tunnel corridor, a 120-kilometre elevated corridor, and the upgrading of 1,500 kilometres of arterial and sub-arterial roads.
He explained that Bengaluru's population and vehicle numbers are growing faster than those of other major Indian cities, while its road capacity is lower. For this reason, the government has given priority to road construction.
Work has begun on a 2-kilometre short tunnel at Hebbal. The 16.5-kilometre North-South corridor is estimated to cost Rs. 17,780 crore, of which the state government will invest Rs. 7,000 crore. The 21-kilometre East-West corridor will have two entry points. The 120-kilometre elevated corridor has been planned under National Highway standards at an estimated cost of Rs. 23,165 crore. It has been divided into four categories, and corridors shorter than 10 kilometres will be toll-free.
The city is also taking up about 500 kilometres of new road connections. This includes 300 kilometres of buffer roads along the storm water channels and 68 kilometres of business corridor development. The 17-kilometre Outer Ring Road will be redeveloped, and an 18-kilometre white-topping project will soon begin on the city's outskirts. The state government has proposed a 37-kilometre double-decker road within the Outer Ring Road area, but the Centre has so far approved only 11 kilometres.
The Chief Minister assured legislators that funds have been allocated without any discrimination and that adequate resources have been provided to every Assembly constituency in the city. He said that if MLAs submit proposals for urgent works in their constituencies, the government will act quickly to release the funds. He added that the Bengaluru Development Authority and the Bangalore Water Supply and Sewerage Board (BWSSB) are making substantial investments in the city's infrastructure.
The government has also prepared a 10-year development plan, as Bengaluru will complete 500 years in 2037. The new projects will require about Rs. 1 lakh crore.
The government aims to increase the metro network from the current 96 kilometres to 170 kilometres by 2027. The city now has 7,000 buses and plans to add 4,500 more. Work on the suburban rail network is in progress, with a target of 150 kilometres of connectivity by 2030. The Chief Minister also said that the Cauvery Stage 6 project will be taken up to supply additional water to the city.
Sixty-five grama panchayats located outside the Greater Bengaluru Authority (GBA) limits are already urbanised. The government plans to upgrade them to urban local bodies to reduce pressure on the city. Drinking water and sewerage systems will be provided in these areas in phases, and proposals for road upgrades are being prepared.
The government has restructured garbage collection contracts to improve waste management in the city. Originally, 33 packages were prepared across 27 zones. Tenders have now been opened for 21 of these packages, and work orders will be issued shortly to all eligible bidders. The new contracts will allow collection of up to 9,000 tonnes of waste, based on vehicle capacity. GPS will be mandatory on all waste collection vehicles, and only new vehicles will be permitted. The Chief Minister warned that strict action will be taken against contractors who neglect their duties.
Bolsonaro backs off Brazil poll challenge after Trump says 'I’m not running Brazil'
Three fishermen die of suspected toxic gas inhalation at Tadadi harbour
Congress desperate for power, wants to create anarchy: Rajasthan BJP
MP: SIT constituted in 19-month-old Cheetah cub killing probe; shotgun pellets found in body
PM Modi to inaugurate 2.62 km forest eco-trail at Ekta Nagar on October 31
SC Issues Notice to Rahul Gandhi Over Plea Alleging He Pushed Pregnant Journalist on October 12
Produce Evidence of ‘Vote Chori’ or Stop False Narrative: TG BJP Chief
Cyclone Arnab: Flash floods alert issued in parts of AP
CM Naidu tweets in Kurnool Solar Plant Is operational, says "we said it, we did it"
PM Modi to inaugurate Emerging Science, Technology, and Innovation Conclave 2026 at Bharat Mandapam today

