Live
- Porous silicon oxide electrodes can fix durability issues in batteries: Researchers
- Jalandhar civic polls: AAP promises launch of 100 e-buses, round the clock water supply
- Economic upliftment of rural women is priority of Tripura govt: CM Saha
- Rajmata Jijabai Trophy: Manipur move to top of the table, T.N register first win
- Italian envoy Baroli hoping to strengthen ties with India through football
- CPI-M revokes suspension of Bengal party leader accused of sexual harassment
- Rachakonda Commissioner Emphasizes Health and Education at Uniform Diet Launch
- BJP leader visits late ASI Surendra Singh in Rajasthan, assures full govt support
- PM Modi tears into Gandhi family for its habit of amending Constitution
- Young Kabaddi Player Dies of Heart Attack During Match in Mandya
Just In
Municipal Administration and Urban Development Departments plans to replace the retrofitting the LED lights with existing lights so as to save power in the State. It is proposed to Implementation of LED Street lighting Project at 12 ULBs of Telangana State.
Municipal Administration and Urban Development Departments plans to replace the retrofitting the LED lights with existing lights so as to save power in the State. It is proposed to Implementation of LED Street lighting Project at 12 ULBs of Telangana State.
1.Gajwel Nagara Panchayat
2. Karimnagar Corporation
3. Nizamabad Corporation
4. Siddipet Municipality
5. Siricilla Municipality
6. Ramagundam Corporation
7. Khammam Corporation
8. Mahbubnagar Municipality
9. Manchiryal Municipality
10.Nalgonda Municipality
11.Tandur Municipality, &
12.Warangal Corporation
Project Details
Scope:
• Retrofitting of existing street lights with LED luminaries
• CCMS at switch points (during full scale project)
• Light quality : to match or exceed existing light output
• Replacement on point to point
Retrofit wattages of LED
Existing wattages, W 40 70 150 250 400
Other losses, W 8 10 15 25 40
Gross wattage, W 48 80 165 275 440
LED Wattage (range) 15-20 35-45 70-85 120-140 190-210
Implementation Plan
Proposed to be implemented in two phases:
Phase -1: Implementation of Pilot stretches in 12 ULBs
Phase -2: Implementation of full-scale Project in 12 ULBs
Objectives of Pilot:
• To understand the practical issues while at site and incorporate the rectifications in full-scale project
• To demonstrate energy consumption, savings and monitoring of the same which would form basis for annuity payments to EESL in full-scale project Implementation
Implementation Steps
- • Rectification of infrastructure by ULBs based on survey findings.
- • EESL to initiate installations in ULBs, for Phase-1
- • Demonstration for 15 days; 7 days for each existing & retrofit fixtures
- • Rectification of infrastructure by ULBs Full-scale Project implementation.
- • Survey of balance street lights to identify infrastructure.
- • Rectification of infrastructure by ULBs
- • Full-scale Project implementation.
Key Points
- MAUD / ULBs to provide authorizations & approvals for full-scale Project
- Replacements on point to point basis
- Installation reports being signed by ULB daily basis
- Empty poles replacement shall be as per adjacent fixtures in the stretch or fixture rationing.
Inventory of lights for Phase-1
- Gajwel Nagar Panchayat: 69
- Mahabubnagar Municipality: 310
- Nalgonda Municipality; 206
- Nizamabad Corporation: 386
- Siddipet Municipality: 204
- Tandur Municipality: 238
- Khammam Corporation: 223
- Mancherial Municipality: 152
- Ramagundam Corporation:206
- Sircilla Municipality; 278
- Warangal Corporation: 418
- Karimnagar Municipal Corporation: 540
Roles and Responsibilities
MAUD/ CDMA EESL ULBs
• Co-ordinating with ULBs / EESL;
• Survey of project area
• Carry out rectification found in primary survey;
• Provide permission to EESL / vendors & authorized representatives;
• Make capital investments in the project
• Authorize EESL / its representatives / vendors for project implementation
• Provide access to Project facility;
• Selection of manufacturers for retrofitting with LEDs
• Handover stretches; • Provide data / support;
• Supervision during implementation
• Appoint Engineer- in-charge;
• Make timely payment against invoices;
• Contract Management
• Acknowledge the receipt of existing fixtures;
• Establish payment security mechanisms;
• Operation & maintenance during contract period
• Co-operate / counter-sign measurement reports;
• After pilot- support for full-scale implementation
• Rectify non-functioning fixtures.
• Issue project completion certificate;
• Take-up full-scale project after completion of pilot
• Access to use of equipment, tools /tackles etc.
After installation of led lights, these are the findings noted.
• Average operating hours in 4 municipalities is < 50%.
• In fact, except for Karimnagar, the operating hours are way below 80%. The following are the possible causes of such high downtime
• Non – working lights o Improper lamp operation
• faults in cables, fuses, etc
• power availability
• Siddipet: Operating hours are at 289% (~ 32 hours daily).
Energy consumption is 2.57 lakh units against computed 0.89 lakh units
• This is technically not possible, except for the following reasons
• Pilferage and power theft
• Mixed load connected to meter
G.Rajendera Kumar