Ramagundam: Power generation stalled at NTPC

Ramagundam: Power generation stalled at NTPC
x
Highlights

Ramagundam: Power Generation Stalled at NTPC. The power generation stalled at the NTPC third unit in Ramagundam in Karimnagar district. It is learnt that there is a leakage in the boiler tube due to which there has been a hindrance in a 200MW power generation.

Hyderabad: The power generation stalled at the NTPC third unit in Ramagundam in Karimnagar district. It is learnt that there is a leakage in the boiler tube due to which there has been a hindrance in a 200MW power generation.

Already, Telangana state has been facing an acute power shortage over a period of time; and due to the sudden failure of the third unit, another stumbling block has been introduced in the power generation.

Show Full Article
Print Article
Next Story
More Stories
ADVERTISEMENT
ADVERTISEMENTS